Fraser Shipyards is called upon for all varieties of repairs, lengthening, repowering, new construction and more. Here are a few of our most recent projects.
[Click on photos for a larger view]
Fraser Shipyards recently built the 70-foot long, 65-ton Greenstone II, a double-skinned fuel barge that was commissioned by the U.S. National Park Service.
The U. S. Coast Guard cutter Alder undergoing minor repairs during her off season, in one of our dry docks during Summer 2008.
In for a routine drydocking.
A look from above.
In December 2009, the Tug Joyce VanEnkevort came into drydock. This picture shows the day it was going to come out of drydock and they flooded the dock. With the below zero temperatures, it created the steam you see in the picture.
© 2010 Fraser Shipyards All Rights Reserved